Εμφάνιση απλής εγγραφής

dc.contributor.author Κωνσταντινίδης, Πέτρος Δ. el
dc.date.accessioned 2015-06-12T09:45:48Z
dc.date.available 2015-06-12T09:45:48Z
dc.date.issued 2015-06-12
dc.identifier.uri http://hdl.handle.net/11400/15796
dc.rights Αναφορά Δημιουργού-Μη Εμπορική Χρήση-Όχι Παράγωγα Έργα 3.0 Ηνωμένες Πολιτείες *
dc.rights.uri http://creativecommons.org/licenses/by-nc-nd/3.0/us/ *
dc.source http://www.sciencedirect.com/science/article/pii/S0377221797000180?np=y# el
dc.subject Project management
dc.subject Production scheduling
dc.subject Optimization
dc.subject Διαχείριση έργου
dc.subject Προγραμματισμός έργου
dc.subject Βελτιστοποίηση
dc.subject Networks/graphs-applications
dc.subject Δίκτυα / γραφήματα-εφαρμογές
dc.subject Facilities /equipment planning-design
dc.subject Εγκαταστάσεις / Εξοπλισμός προγραμματισμός-σχεδιασμός
dc.title A model to optimize project resource allocation by construction of a balanced histogram en
heal.type journalArticle
heal.classification Engineering
heal.classification Civil engineering
heal.classification Μηχανική
heal.classification Πολιτική μηχανική
heal.classificationURI http://skos.um.es/unescothes/C01363
heal.classificationURI http://skos.um.es/unescothes/C00606
heal.classificationURI **N/A**-Μηχανική
heal.classificationURI **N/A**-Πολιτική μηχανική
heal.keywordURI http://zbw.eu/stw/descriptor/12154-6
heal.keywordURI http://id.loc.gov/authorities/subjects/sh85118098
heal.keywordURI http://skos.um.es/unescothes/C02848
heal.identifier.secondary doi:10.1016/S0377-2217(97)00018-0
heal.language en
heal.access campus
heal.recordProvider Τ.Ε.Ι. Αθήνας. Σχολή Τεχνολογικών Εφαρμογών. Τμήμα Πολιτικών Μηχανικών Τ.Ε και Μηχανικών Τοπογραφίας & Γεωπληροφορικής Τ.Ε. el
heal.publicationDate 1998-02
heal.bibliographicCitation Konstantinidis, P. (1998). A model to optimize project resource allocation by construction of a balanced histogram. "European Journal of Operational Research", 104(3), February 1998. pp. 559-571. Available from: http://www.sciencedirect.com/science/article/pii/S0377221797000180?np=y. [Accessed 11/06/1998] en
heal.abstract This paper examines a scheduling method to improve productivity in resource-constrained projects. When resources are nonrenewable the duration of each activity has only one value. Optimal solutions are derived through criticalism of groups of activities using the same resource so as to eliminate interruption times and associated costs. The corresponding resource histogram is balanced and its design is derived by means of a program suitable for personal computer implementation. In the case where resources are renewable, activity durations are resource driven. We introduce a new view of discreetness for activity execution times which enables us to obtain optimal solutions relating to the cost functions of the activities. Finally we account for doubly constrained resources by (a) defining a maximum level of resource utilization and a maximum cost increase per period of usage of renewable resources and (b) considering as acceptable only those optimal solutions which keep total cost increase for the overall project below a tolerable limit. An application example is given using personal computer and commercially available software. en
heal.journalName European Journal of Operational Research en
heal.journalType peer-reviewed
heal.fullTextAvailability true


Αρχεία σε αυτό το τεκμήριο

  • Όνομα: 1-s2.0-S0377221797000180-main.pdf
    Μέγεθος: 697.6Kb
    Μορφότυπο: PDF

Οι παρακάτω άδειες σχετίζονται με αυτό το τεκμήριο:

Εμφάνιση απλής εγγραφής

Αναφορά Δημιουργού-Μη Εμπορική Χρήση-Όχι Παράγωγα Έργα 3.0 Ηνωμένες Πολιτείες Εκτός από όπου ορίζεται κάτι διαφορετικό, αυτή η άδεια περιγράφεται ως Αναφορά Δημιουργού-Μη Εμπορική Χρήση-Όχι Παράγωγα Έργα 3.0 Ηνωμένες Πολιτείες